| 20 January 1961 | | Completion | new group of buildings associated with existing engineering building - including workshops, laboratories for electrical and structural engineering, library, lecture halls, student common room and staff accommodation; different materials have been used: lecture theatre of reinforced concrete with timber cladding; steel and glass link bridge; 2-storey lab and drawing office in exposed welded steel clad in plywood and aluminium; 5-storey library and staff room in reinforced (partly pre-stressed) concrete frame, clad with moisac lined brick on ends; classroom unit with structural brick party walls; use of aluminium windows throughout per Builder p101 |