Basic Site Details Name: | Bonded stores, blending, bottling hall | City or county: | Glasgow | Country: | Scotland | Parish: | | Status: | | Grid ref: | | Notes: | Cost £1.7m. Cost given in 1975 as £4m. | Building Type ClassificationThe building is classified under the following categories: | | Classification | Original classification? | Notes | | Bonded Warehouse | | | | Factory | | |
EventsThe following date-based events are associated with this building: | | From | To | Event type | Notes | | 1964 | 1968 | Build/construction | |
PeopleDesign and ConstructionClientsThe following individuals or organisations have commissioned work on this building/design: | | Name | Notes | | Clyde Bonding Co | |
ReferencesBibliographic ReferencesThe following books contain references to this building: | | Author(s) | Date | Title | Part | Publisher | Notes | | RIBA | 1970 | RIBA Directory 1970 | | | | | RIBA | 1975 | RIBA Directory of practices | | | |
|