Basic Site Details

Name: Loch Lee Water Board Contract Nos 2/3 Filter Station, 3/5 Pipeline and 3/7 Dam
City or county:  
Country: Scotland
Parish:  
Status:  
Grid ref:
Notes:  

Building Type Classification

The building is classified under the following categories:
 ClassificationOriginal classification?Notes
Item 1 of 3WATER SUPPLY AND DRAINAGE  
Item 2 of 3Waterworks  
Item 3 of 3Dam  

Events

The following date-based events are associated with this building:
 FromToEvent typeNotes
Item 1 of 26 March 1959 Proposed'Construction of the civil engineering parts of a filter station having six r.c. sedimentation tanks and four filters...6,000 ft. of 24 in. dia. s.i. pipeline [from dam to filter station]...low concrete dam at Loch Lee (about 510 ft. long)...Dep. £5 per contract.' per Builder p478
Item 2 of 25 May 1961 Contract offeredfor various trades to complete filter station; Crouch & Hogg are consultants per Builder p878

People

Design and Construction

The following individuals or organisations have carried out design/construction work. Where architects or practices worked together, matching letters appear beside their names in the Partnership Group column.
 NameRolePartnership GroupFromToNotes
Item 1 of 1Crouch & Hogg  6 March 1959 accepting tender applications per Builder p478 - CHECK role

Clients

The following individuals or organisations have commissioned work on this building/design:
 NameNotes
Item 1 of 1Loch Lee Water Board 

References

Periodical References

The following periodicals contain references to this building:
 Periodical NameDateEditionPublisherNotes
Item 1 of 3Builder6 March 1959  p478
Item 2 of 3Builder10 June 1960  p1124
Item 3 of 3Builder5 May 1961  p878